§ 112-121. Site design feasibility.  


Latest version.
  • Stormwater management practice for a site shall be chosen based on the physical conditions of the site. Applicants shall consult the current LDM for guidance on the factors that determine site design feasibility when selecting a stormwater management practice.

(Ord. No. 1812, § 5.2, 7-23-2018)